Analysis of Factors Affecting Labor Productivity in Drainage Channel Rehabilitation Project in Ubud District

Authors

  • I Komang Agus Ariana Universitas Pendidikan Nasional
  • Ngakan Made Anom Wiryasa Universitas Udayana
  • Ngakan Ketut Acwin Dwijendra Universitas Udayana
  • Anak Agung Gde Agung Yana Universitas Udayana
  • I Wayan Sutama Universitas Pendidikan Nasional
  • Ketut Dayuh Universitas Pendidikan Nasional

DOI:

https://doi.org/10.55927/fjmr.v4i6.153

Keywords:

Construction Projects, Workforce Management, Workforce Productivity

Abstract

In managing the use of labor effectively, contractors must understand worker productivity. Labor productivity is an important factor in the efficiency of a construction project and can have a significant impact on project performance. This study aims to assess the effective, ineffective, and contributing working time of the Drainage Rehabilitation Project in Ubud Regency and to identify the factors that affect the productivity of the workforce on this project. The methodology used was productivity ratings, which were categorized into three groups: effective working time, contributory working time, and ineffective working time. The results showed that during the five days of observation, effective working time amounted to 83 hours and 6 minutes, ineffective working time was 22 hours and 20 minutes, and contributory work time was only 5 hours and 36 minutes. Key factors that affect productivity include working hours and labor behavior, such as being late, ineffective time spent smoking, conversing with coworkers, and leaving work zones. In addition, productivity decreased on Fridays due to shorter working hours related to religious observance, resulting in an average project productivity of only 72.58%.

References

Damayanti, Y.A., Sitompul, M. (2021). Analisis Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Pembangunan Jalan Tol Ruas Binjai-Langsa Seksi Binjai-Pangkalan Brandan. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS).

Daryanto, Rahardjo, M. (2012). Model Pembelajaran Inovatif. Gava Media.

DR. Candra Wijaya, M.P., Dr. H. Ojak Manurung, S.Ag., S.H, S.E., M. P. (2021). Produktivitas Kerja ; Analisis Faktor Budaya Organisasi, Kepemimpinan Spiritual, Sikap Kerja, dan Motivasi Kerja untuk Hasil Kerja Optimal. Kencana.

Efrizal, F. (2019). Analisa Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Pada Proyek Perumahan di Pekanbaru. Univestias Islam Riau Pekanbaru.

Hernandi, Y., Tamtana, J. S. (2020). Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 299.

Jayananda, I.W.E., Marhaeni, A. A. I. N. (2023). Analisis Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Di Kabupaten/Kota Provinsi Bali. E-Jurnal Ekonomi Dan Bisnis Universitas Udayana, 12(01), 121–131.

Norjana, N., Zulfiati, R. (2020). Analisa Produktivitas Tenaga Kerja Terhadap Pekerjaan Kolom Dan Balok Beton Bertulang. Jurnal Talenta Sipil, 3(2), 82–86.

Oglesby. (1989). Productivity Improvement in construction. McGraw-Hill Book Company.

Ricson. (2013). Analisis Faktor-Faktor Produktivitas Tukang Dan Pekerja Dalam Proyek Konstruksi Berdasarkan Pengalaman Kerja. Universitas Atma Jaya Yogyakarta.

Sinungan, M. (2005). Produktivitas: Apa Dan Bagaimana. Bumi Aksara.

Downloads

Published

2025-06-20

Issue

Section

Articles